The Impact of Schedule Crashing on Project Performance: An Application to Construction Projects in Riyadh Region
DOI:
https://doi.org/10.59992/IJSR.2024.v3n8p3Keywords:
Schedule Crashing, Project Performance, Project Management, Project Acceleration, Riyadh RegionAbstract
The aim of this study was to investigate the impact of schedule crashing on project performance: an application to construction projects in the Riyadh region. Schedule crashing is an important technique used to accelerate project completion, but it can have negative effects if not managed properly. The study focuses on five key aspects of project performance: duration, cost, scope, quality, and stakeholder satisfaction. The study adopted a descriptive-analytical methodology and used a questionnaire as a tool for collecting primary data. The questionnaire was distributed to a random sample from the research community, which included engineers working on construction projects in the Riyadh region of Saudi Arabia. A total of 436 questionnaires were obtained, and after inspection and verification, 390 valid questionnaires were analyzed. The data was analyzed, and the hypotheses were tested using SPSS software. The results showed a statistically significant impact of schedule crashing on project performance, affecting duration, cost, scope, quality, and stakeholder satisfaction. The study provided several recommendations to improve schedule crashing management and reduce negative impacts.
References
- أبرار عاطف حسين أصغر (2020). تعثر وتأخر المشاريع الإنشائية بالمملكة العربية السعودية. مؤتمرات الآداب والعلوم الإنسانية والطبيعية.
- الجبوري، أشواق سالم حسن، ومصطفى، رمضان جبر محمد. (2021). أثر استخدام أنظمة تخطيط مصادر المشروع على تحسين أداء المشاريع الإنشائية في الأردن. جامعة مؤتة، مؤتة. مسترجع من http://search.mandumah.com/Record/1214873
- الخرابشة، محمد فارس، وقطيشات، رانية جعفر. (2022). إدارة الوقت وأثرها في إنجاز المشاريع الحكومية في الأردن: حالة دراسية في وزارة الأشغال العامة والإسكان. جامعة البلقاء التطبيقية، السلط. مسترجع من http://search.mandumah.com/Record/1303503
- الزعبي، فراس علي خليفة، والجغبير، محمد إسماعيل محمد. (2023). أثر تطبيق ممارسات إدارة العمليات على أداء المشاريع الإنشائية: دراسة حالة على جمعية مستثمري قطاع الإسكان في الأردن. مؤتة للبحوث والدراسات - سلسلة العلوم الإنسانية والاجتماعية، مج 38، ع4، 163 - 208. مسترجع من http://search.mandumah.com/Record/1410351
- الشيخ، هنادي الفاتح قرشي، وبشارة، معاذ عثمان. (2018). أثر زيادة الوقت على أداء المشاريع الإنشائية. جامعة أم درمان الاسلامية، أم درمان. مسترجع من http://search.mandumah.com/Record/998860
- المعادات، هديل محمد حديثه، وأبو زيد، محمد خير سليم. (2021). تأثير تخطيط المشروع على نجاح المشاريع الإنشائية: الدور المعدل لمستوى المخاطرة: دراسة تطبيقية في شركات مشاريع الإنشاءات الأردنية. جامعة البلقاء التطبيقية، السلط. مسترجع من http://search.mandumah.com/Record/1302868
- الهيئة السعودية للمهندسين. (2024). التقارير الذكية. مسترجع من https://www.saudieng.sa/Arabic/OpenData/Pages/IntelligenceReports.aspx
- الهيئة العامة للإحصاء. (2022). التقديرات السكانية في المملكة العربية السعودية. مسترجع من https://database.stats.gov.sa/home/indicator/535
- بن حميد، & أسماء يوسف. (2020). دراسة أثر استخدام استراتيجيات التنفيذ المختلفة للمشروعات الإنشائية على أداء الأطراف الرئيسية في مشاريع الإنشاءات باستخدام نموذج الأداء العام.
- حنان عبد الله نذير. (2023). أثر تطبيق أساليب القيادة الموقفية على تحسين أداء المشاريع. مجلة الفنون والأدب وعلوم الإنسانيات والاجتماع، (95)، 159-203.
- خنيوة، & محمد الأمين. (2023). فعالية استخدام التحليل الشبكي في إدارة الموارد المالية للمشاريع الإنشائية، دراسة حالة مشروع بناء 1500 وحدة سكنية بولاية جيجل. Revue des Sciences Humaines & Sociales, 9(1), 100-119.
- زيراري، تيجاني، وديعة، & العربي. (2023). إمكانية ضغط زمن تنفيذ المشروع باستخدام نظرية الشبكات (Doctoral dissertation, جامعة ابن خلدون-تيارت).
- سماني، أحمد عيسى، وعماري، عبدالرحمن ناصر. (2023). أثر إدارة المخاطر الإنشائية على جودة المباني بمدينة الرياض في المملكة العربية السعودية. جامعة ميدأوشن.
- عبد الصاحب نجم عبد، & أمال عبد الجبار حسن. (2018). تخطيط وجدولة تنفيذالمشاريع الحكومية: بحث تطبيقي لمشاريع/ مديرية الأبنية المدرسية/ دائرة المشاريع/ مشروع الوزارة رقم (1). Journal of Accounting and Financial Studies (JAFS), 13(43).
- على، أ. ح. (2023). تطبيق منهجية البناء الخالي من الهدر في تحسين أداء مشروعات البناء في مصر Applying the lean construction methodology to improve the performance of construction projects in Egypt. JES. Journal of Engineering Sciences, 51(3), 202-217.
- فضيلة سلمان داود، & زينب هادي حسين. (2016). دور إسلوبي (CPM/PERT) في تعزيز أداء المشاريع الإنشائية دراسة تطبيقية في قسم المشاريع في ديوان محافظة بغداد. Journal of Economics and Administrative Sciences, 22(94), 84-84.
- محمد، محمد سيد أحمد إبراهيم، وبشارة، معاذ عثمان. (2019). تأثير سوء التخطيط في تنفيذ المشاريع الإنشائية. جامعة أم درمان الاسلامية، أم درمان. مسترجع من http://search.mandumah.com/Record/1345074
- محمد نجم عبود، & أ. د. خولة حسين حمدان. (2022). استعمال انموذج KPI لتدقيق أداء المشاريع الريادية بحث تطبيقي على مشروع استعمال الكثبان الرملية كمواد بناء جامعة بغداد. Al Kut Journal of Economics and Administrative Sciences, 14(44), 142-159.
مراجع الدراسة الأجنبية
- Abuwarda, Z., & Hegazy, T. (2019). Multi-dimensional optimization model for schedule fast-tracking without over-stressing construction workers. Canadian Journal of Civil Engineering, 46(12), 1160-1173.
- Ahmed, M. I., Brijbhushan, S., & Maneeth, P. D. (2017). Planning, Scheduling, Resource Allocating and Tracking of Residential (G+ 2) Villa Using Primavera P6. International Research Journal of Engineering and Technology (IRJET), 4(8), 967-971.
- Al-Janabi, A. M., Abdel-Monem, M. S., & El-Dash, K. M. (2020). Factors causing rework and their impact on projects’ performance in Egypt. Journal of civil engineering and management, 26(7), 666-689.
- Alotaibi, N. O., Sutrisna, M., & Chong, H. Y. (2016). Guidelines of using project management tools and techniques to mitigate factors causing delays in public construction projects in kingdom of Saudi Arabia. Journal of Engineering, Project, and Production Management, 6(2), 90-103.
- Ballesteros-Pérez, P., Elamrousy, K. M., & González-Cruz, M. C. (2019). Non-linear time-cost trade-off models of activity crashing Application to construction scheduling and project crashing with fast-tracking. Automation in Construction, 97, 229-240.
- Banihashemi, S. A., & Khalilzadeh, M. (2021). Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, 28(7), 1979-2004.
- Banihashemi, S. A., & Mohammad, M. (2022). Time-cost-quality-risk trade-off project scheduling problem in oil and gas construction projects: fuzzy logic and genetic algorithm. Jordan Journal of Civil Engineering, 16(2).
- Biruk, S., & Jaśkowski, P. (2020). Selection of the optimal actions for crashing processes duration to increase the robustness of construction schedules. Applied Sciences, 10(22), 8028.
- Biruk, S., & Rzepecki, Ł. (2021). A simulation model of construction projects executed in random conditions with the overlapping construction works. Sustainability, 13(11), 5795.
- Egbelakin, T., Ogunmakinde, O. E., Teshich, B., & Omotayo, T. (2021). Managing fast-track construction project in Qatar: Challenges and opportunities. Buildings, 11(12), 640.
- Elkabalawy, M., & Al-Sakkaf, A. (2021, May). Decision support NSGA-ii optimization method for resource-constrained Schedules Crashing with allowed activity splitting. In Journal of Physics: Conference Series (Vol. 1900, No. 1, p. 012016). IOP Publishing.
- Elkabalawy, M., & Moselhi, O. (2022). Optimized resource-constrained method for project Schedules Crashing. Engineering, Construction and Architectural Management, 29(5), 2106-2129.
- Hazini, K., Dehghan, R., & Ruwanpura, J. (2013). A heuristic method to determine optimum degree of activity accelerating and overlapping in Schedules Crashing. Canadian Journal of Civil Engineering, 40(4), 382-391.
- Jagtap, P., Patel, C., Raorane, L., Salunkhe, A., & Walekar, V. (2022). Planning, Scheduling, Budgeting and Tracking of a Multi-Storey Building Using Primavera P6. International Journal of Research in Engineering, Science and Management, 5(5), 220-228.
- Juliana, A., Oladimeji, O., Abiodun, A. O., Haddad, A. N., & Tam, V. W. (2024). Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), 888-893.
- Kantianis, D. (2023). Construction Project Crashing with Uncertain Correlated Normal and Crash Task Durations and Costs: An Integrated Stochastic Practical Approach. European Project Management Journal, 13(1), 3-22.
- Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2016). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of management in engineering, 32(1), 04015032.
- Prabhat Kc, P. (2015). Schedule Pressure in Construction Projects in Nepal. Journal of Advanced Academic Research, 1(1), 76–84. https://doi.org/10.3126/JAAR.V1I1.13516.
- Project Management Institute. (2019). Practice Standard for Scheduling—Third Edition. Newtown Square, PA: Project Management Institute.
- Project Management Institute. (2021). A guide to the Project Management Body of Knowledge (PMBOK® Guide) (7th ed.). Newtown Square, PA: Project Management Institute.
- Rondon Andueza, P. J. (2014). Shortening the execution time in projects: a state-of-the-art survey (Master's thesis, Institutt for produksjons-og kvalitetsteknikk).
- Saf'a, N. M., Karakoc, D. B., Ghorbani-Renani, N., Barker, K., & González, A. D. (2022). Project Schedules Crashing for the efficient restoration of interdependent infrastructure systems. Computers & Industrial Engineering, 170, 108342.
- Sammy, K. (2014). Factors affecting the performance of construction projects in Mombasa County, Kenya (Doctoral dissertation, University of Nairobi).
- Thompson, S. K. (2012). Sampling (3rd ed.). John Wiley & Sons, Inc., Hoboken, New Jersey.
- Tomczak, M., & Jaśkowski, P. (2020). Crashing construction project schedules by relocating resources. Ieee Access, 8, 224522-224531.
- Vidhyasri, R., & Sivagamasundari, R. (2017). A review on factors influencing construction project scheduling. International Journal of Civil Engineering and Technology, 8(3), 146-157.
- Webb, C., GAO, L., & Song, L. G. (2016). Schedules Crashing impact on construction project safety. Frontiers of Engineering Management, 2(4), 344-350.
- Wickramasinghe, B. M. S. M., & Disaratna, V. (2018). Impact of Schedules Crashing on successful delivery of Sri Lankan construction projects. Sustainability for people, 99.
- Xie, W., Deng, B., Yin, Y., Lv, X., & Deng, Z. (2022). Critical factors influencing cost overrun in construction projects: A fuzzy synthetic evaluation. Buildings, 12(11), 2028.